Solar Saving Calculator Malaysia

Use a simple monthly bill estimate as a starting point. The result should guide discussion, not replace a proper roof and technical assessment.

Start with your monthly electricity bill.

The original calculator is restored here through the site shortcode, with the surrounding Bricks layout keeping the page readable.

Solar Savings Calculator

Get an instant estimate of your potential solar savings. Takes less than 30 seconds.

RM

Please enter a bill amount between RM 100 and RM 50,000.

kWh

Please enter a valid usage between 50 and 100,000 kWh.

Calculating your solar potential...

    Your Estimated Solar Savings

    Monthly Savings

    System Size

    System Cost

    Payback Period

    Adjust system size 0 kWp
    min 1.5 kWp max 5.0 kWp
    Best Savings

    No. of Panels

    Solar Generation

    Annual Savings

    Annual Generation

    CO₂ Reduction

    Trees Equivalent

    These figures are estimates based on average Malaysian electricity tariffs and standard market data. Actual savings, system costs, and payback periods will vary depending on your roof condition, panel brand, inverter quality, and installer pricing. Use this as a starting point for your own research.

    How the savings estimate works.

    Bill

    Monthly usage

    The bill gives an initial signal of energy demand and possible system range.

    Design

    System output

    Panels, inverter, roof angle, orientation, shade, and weather affect generation.

    Rules

    Programme limits

    Solar ATAP capacity and approval details should be checked against current requirements.

    Why Your Final Solar Savings May Differ

    Daytime usage

    Using electricity while solar is generated can affect how much value the system returns.

    Shade and roof space

    Trees, nearby buildings, roof shape, and equipment placement can reduce usable capacity.

    Equipment scope

    Panel, inverter, monitoring, warranty, and workmanship should be compared carefully.

    Approval conditions

    Final capacity depends on technical review and current programme rules.