Commercial Solar Guide for Businesses

Rooftop solar can cut a business's daytime electricity costs. This guide explains how commercial solar works across Malaysia, which rules apply in your state and what to check before you compare proposals. Solar Plus does not sell or install solar.

Solar panels covering a commercial factory rooftop at sunset
1,000 kW

Solar ATAP limit, or 100% of maximum demand if lower

72 kW

Above this, a connection assessment study applies

18 months

To start operating after Solar ATAP approval

2030

Green technology tax incentives extended until

Who This Guide Is For

The right questions change with the type of premises. Start with the row that fits your business.

Workers on a busy factory floor during daytime operating hours

Shoplot or small business

Daytime use, roof size, whether you own the building

Office

Weekday daytime load, what happens to weekend surplus

Warehouse

Large roof but often light load. Size to what you use, not to the roof.

Factory

High load, maximum demand, technical studies for larger systems

Tenanted or shared building

Who holds the electricity account and whether the premises qualify

Is Commercial Solar Worth It for Your Business?

Solar works best for businesses that use most of their electricity during the day. In Peninsular Malaysia, solar you use yourself saves more than solar you send to the grid, because Solar ATAP credits exports at the average System Marginal Price (SMP), not at your energy charge.

Check these before you ask for any proposal:

  • How much of your power you use between 7am and 7pm
  • How many days a week you operate
  • Your tariff category and voltage level
  • How long you plan to stay at the premises
  • The age and condition of your roof

We do not quote a typical payback period, as it depends too much on your own load and tariff. For a rough first figure, try our solar savings calculator and treat the result as indicative.

Business daytime load compared with rooftop solar outputA business that uses most of its power between 7am and 7pm consumes most of its own solar output on site, with only a small midday surplus exported to the grid.12am6am12pm6pm12am7am to 7pm
Business loadSolar used on siteSolar exported

How Your Commercial Electricity Bill Works and What Solar Offsets

Since July 2025, TNB bills for businesses show separate energy, capacity, network and retail charges, plus the Automatic Fuel Adjustment (AFA). Solar affects each one differently.

Bill item (TNB, Peninsular)Solar you use on siteSolar you export (Solar ATAP)
Energy charge (per kWh)ReducedCredited at average SMP, within the same billing period
AFA (per kWh)Reduced, as you buy fewer kWhCannot be offset by export credits
Capacity and network charges, low voltage (per kWh)ReducedNot offset at the energy charge rate
Capacity and network charges, medium or high voltage (per kW of maximum demand)Only reduced if solar lowers your recorded peak, which cloudy days can undoNot offset
Retail charge (fixed monthly)Not reducedNot offset

The lesson for most businesses: size the system so you use nearly all of it yourself.

Solar ATAP vs Self Consumption Only (SELCO) in Peninsular Malaysia

Businesses in Peninsular Malaysia choose between two routes. Solar ATAP lets you export surplus for bill credits. SELCO keeps every unit on site.

Solar ATAP

Solar ATAP power flowSolarPremisesTNB grid

SELCO

SELCO power flowSolarPremisesTNB grid
PointSolar ATAPSELCO
Export to the gridAllowed, credited at average SMPNot allowed at any time
Size limit100% of maximum demand or 1,000 kW, whichever is lowerNo kWac cap for business premises, subject to technical approval
Unused creditsForfeited at the end of each billing periodNot applicable
ContractUp to 10 years, then self consumptionNo contract term
Technical studyConnection Assessment Study above 72 kWConnection assessment above 72 kWac
BatteryOptional, needs a detailed designRequired above 1 MWac, at least one hour of storage
Who appliesA SEDA registered PV service provider (RPVSP), first come, first servedLicence from the Energy Commission, or an exemption notice
Best forBusinesses with some surplus, such as on weekendsBusinesses that use almost all their solar on site, or need more than 1,000 kW

You cannot join both. SELCO does not apply to premises already in, or applying for, NEM or Solar ATAP. If you want the history of how these schemes replaced NEM, read how Malaysia’s solar schemes have changed.

Commercial Solar in Sabah and Sarawak

Solar ATAP only covers Peninsular Malaysia. East Malaysia has its own rules.

Check the latest rules with ECoS or Sarawak Energy before you compare proposals.

Sabah: businesses use SELCO PV Sabah 2.0. Systems cannot export to the grid, are limited to 85% of maximum demand, and need ECoS approval before installation.

Sarawak: businesses can apply for Sarawak Energy's NEM. Applications are capped at 50 kWac, and larger systems need a special agreement.

Tenanted, Shared and Strata Premises

Who holds the electricity account decides what you can do.

  • Multi tenant premises, where the landlord and each tenant have their own supply, are not eligible for Solar ATAP.
  • Under SELCO, a tenant counts as an occupier. The landlord and tenant can agree who installs and maintains the system. The solar must only power that tenant’s own premises.
  • Selling solar to other tenants in the same building needs a public distribution licence.

Before you sign anything, get the landlord’s written consent for roof works and agree what happens to the system if you move out.

How a Commercial System Is Sized

A good proposal sizes the system to your daytime load, not to your roof.

  1. Collect 12 months of electricity bills.
  2. Get your load profile, which shows when you use power during the day.
  3. Note your maximum demand.
  4. Check roof area, structure and shading.
  5. Size the system to what you use during the day, within your scheme’s limit.

The steps are the same ones we explain in how to size a solar system in Malaysia, only with larger numbers and stricter limits.

Engineer in safety gear inspecting a commercial rooftop solar array

Costs and Ways to Pay

Prices vary with system size, roof type and equipment, so compare proposals on the same assumptions. How you pay affects who owns the system and who looks after it.

Outright purchase

Who owns it
Your business
Upfront cost
Full cost
Who maintains it
Your business, often with an O&M contract

Loan or hire purchase

Who owns it
Your business
Upfront cost
Deposit or none
Who maintains it
Your business

Lease

Who owns it
Leasing company, then possibly you
Upfront cost
Low or none
Who maintains it
Check the contract

Power purchase agreement (PPA)

Who owns it
The provider
Upfront cost
None
Who maintains it
The provider

With a lease or PPA, check the contract term, the buyout price, and what happens if you sell or leave the premises.

Tax Incentives for Commercial Solar

Businesses that buy solar for their own use may qualify for the Green Investment Tax Allowance (GITA). GITA Asset for own consumption is handled by MGTC. GITA Project and the solar leasing exemption are handled by MIDA.

In Budget 2027, the government said green technology tax incentives will be extended and enhanced until 31 December 2030. This includes investment tax allowances of up to 100% for companies buying green technology assets for their own use.

The detailed guidelines for the new period are not out yet. Check with MGTC and MIDA, and speak to your tax adviser before you rely on any allowance. Solar Plus does not give tax advice.

Solar and ESG Reporting

Rooftop solar reduces the electricity you buy from the grid, which can lower the emissions you report for purchased power.

Under both Solar ATAP and SELCO, environmental attribute credits belong to the consumer. Keep your generation and meter records, and do not claim the same solar output twice if you sell or transfer renewable energy certificates.

How to Compare Commercial Solar Proposals

Give every provider the same bills and load data, then compare like for like.

Business owners reviewing commercial solar proposal documents at a table
  • System size in kWp and kWac
  • Which scheme the proposal uses, and whether it fits your state
  • Expected yearly generation, with the assumptions shown
  • Panel, inverter and mounting brands, with warranty terms
  • RPVSP registration on SEDA’s directory (Peninsular), or ECoS or Sarawak Energy requirements
  • Who handles the application, technical studies and their fees
  • Operation and maintenance (O&M) scope and response time
  • Roof warranty and insurance
  • Payment schedule and contract terms

Project Stages from Bill Review to Commissioning

Most Solar ATAP projects follow these steps. Larger systems take longer because of technical studies.

  1. Bill and load review
  2. Site survey
  3. Design and proposal
  4. Appoint an RPVSP, who submits the Solar ATAP application
  5. Connection Assessment Study for systems above 72 kW
  6. Installation
  7. Testing and commissioning by a competent person
  8. TNB installs the bidirectional meter and the contract starts

The system must start operating within 18 months of approval, or the approval is cancelled. SELCO, Sabah and Sarawak projects follow their own approval steps.

Project team in safety gear on a commercial rooftop solar installation

Batteries, Maintenance and Monitoring

A battery can help a business use more of its own solar, for example in the evening. Solar ATAP allows batteries with a detailed design. Under SELCO, systems above 1 MWac must include one. Weigh the extra cost against the savings.

Plan maintenance from day one. Ask who cleans the panels, checks the inverters and responds to monitoring alerts.

Technician in a hard hat inspecting rooftop solar panels

Frequently Asked Questions

Is solar worth it for a business in Malaysia?

It usually makes most sense when you use a large share of your electricity during the day. Check your load profile and tariff before you compare proposals.

How big can a commercial system be under Solar ATAP?

Up to 100% of your maximum demand or 1,000 kW, whichever is lower. Network limits can reduce this further.

What happens to solar we export on weekends?

Under Solar ATAP, it is credited at the average SMP and can only offset that billing period. Unused credits are forfeited, so avoid sizing for large surplus.

Can my business use Solar ATAP in Sabah or Sarawak?

No. Solar ATAP only covers Peninsular Malaysia. Businesses in Sabah use SELCO PV Sabah 2.0, and businesses in Sarawak can apply for Sarawak Energy’s NEM.

Can a tenant install solar?

Multi tenant premises are not eligible for Solar ATAP. Under SELCO, a tenant can install solar for its own premises if it agrees the terms with the landlord.

Do larger systems need a technical study?

Yes. In Peninsular Malaysia, systems above 72 kW need a connection assessment under both Solar ATAP and SELCO. In Sarawak, a power system study applies above 30 kWac.

How long does a commercial project take?

It depends on system size and studies. Under Solar ATAP, the system must start operating within 18 months of approval.

Can my company claim tax allowances on solar?

Possibly, through GITA. Check the current guidelines with MGTC and MIDA, and confirm with your tax adviser.

Next step

Study your electricity profile first.

A calculator estimate is a useful first step before you compare proposals.